PAC - Graphing the Cost Curves Lesson
Graphing the Cost Curves Lesson
The basic behavior of the production function and the cost measures is the same at any firm, for any market structure. Therefore, there are generic cost curves that can be drawn to represent costs at any given firm.
Because there are two basic types of costs considered by the firm, total and average, there are two types of graphs that can be drawn.
"Totals" Graph
This graph includes total variable cost, total fixed cost, and total cost. Quantity (Q) is placed on the x-axis and costs (dollar amounts $) are placed on the y-axis. The graph below shows the generic "totals" curves. Let's consider the relationship between these "totals."
Totals Graph
Recall, TC = TVC + TFC. Therefore, the total cost curve will always be placed above the TVC and TFC curves. Because total fixed cost is fixed, or constant, it can be drawn as a horizontal curve fixed at the dollar amount of total fixed cost (assuming the existence of fixed cost, this will always be a dollar amount greater than $0). The total variable cost curve will always originate at the origin because TVC varies with production. That is, when a firm is producing 0 units of output, it will have $0 in variable cost. The total cost curve will originate at the same value on the y-axis as the TFC curve. That is because when output is at 0 units, the firm will still have fixed cost although it would have a $0 variable cost.
Oftentimes, the "totals" graph will only display two of the three "totals" curves - TC and TFC or TC and TVC. The distance between the two curves displayed will be the value of the third cost measure.
What does a "totals" graph reveal?
A "totals" graph will only reveal information related to TC, TVC, and TFC. That is, only vertical distances can be read on this graph.
"Averages" Graph
This graph includes average total cost, average fixed cost, average variable cost, and marginal cost. Quantity (Q) is placed on the x-axis and costs (dollar amounts $) are placed on the y-axis. The graph below shows the generic "averages" curves. Let's consider the relationship between these "averages."
Short Run Costs of Production
View the following video to learn more about the relationship between a firm's short-run costs of production. To make the video full screen, click the double arrows at the bottom right corner of the object.
What will an "averages" graph reveal?
An "averages graph" obviously can be read to determine average cost values. This would mean reading vertical distances at a particular quantity. However, "averages graphs" can also be read to determine "total" values (TC, TVC, and TFC). When reading an "averages" graph to determine "'total" values, you will find rectangular areas. Remember, to find the area of a rectangle using this equation - A = L x W.
Why do rectangular areas reveal values for the "total" cost measures?
The graph is explicitly displaying averages. Averages are found by dividing a "total" by a particular quantity. So, if you have an average value and would like to get back to the "total" value, you would multiply the average by the quantity.
Reading Averages Graph
Do we really need these diagrams?
The video below highlights the finer points of reading "totals" and "averages" graphs. To make the video full screen, click the double arrows at the bottom right corner of the object.
What Happens When Costs Change?
Sometimes, costs at firms will change. These changes can be the result of changes in resource costs, taxes, subsidies, and a variety of other factors. When costs at the firm change, the cost curves will either shift up (showing an increase in costs) or down (showing a decrease in cost). It is appropriate to view these shifts as "up" or "down" because costs are measured on the vertical axis.
Two types of changes can occur in costs. A "per unit" change can occur. If this is the case, then MC, AVC, and ATC are all impacted. All three of these curves are impacted because they each are impacted by per unit changes in production. However, a "lump sum" change can also occur in costs. If this is the case, then only ATC is impacted (because it would equate to a change in fixed cost and ATC includes fixed costs).
Changes in Costs Graphs 1 and 2
IMAGES CREATED BY GAVS